Construction of the Clyde Campbell Solar Carpark and EV Charging Station officially commenced in early July. Electrical work for the 75kW DC fast Electric Vehicle (EV) charger, capable of charging two cars at one, has been installed.


Today crews resurfaced the area of the Solar Carpark with asphalt and prepared the landscaping sections.


The next phase of this project will be constructing a 100kW solar array, which doubles as a shade structure – Engineered to withstand floods.


At the same time today, the carpark was repaired in sections from damage due to the 28 February natural disaster. Crews prepared the surface of the carpark and resurfaced it with asphalt.