Skip To

  • Skip to content
  • Jump to navigation
  • Search

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

You are here:

  • Home
  • North Lismore Plateau - Proposed Subdivision - Further Amendment April 2025

Documents

  • document icon Exhibit MPM 3 - 02. VMP (Rev E) prepared by AWC dated 26.7.24(2).PDF (86.3 MB) (PDF)
  • document icon Exhibit MPM 3 - 03. EMP (Rev C) prepared by AWC dated 26.7.24(2).PDF (42.4 MB) (PDF)
  • document icon Exhibit MPM 3 - 04. Flood Impact Letter prepared by BRS dated 27.7.24(2).PDF (344 KB) (PDF)
  • document icon Exhibit MPM 3 - 05. Stormwater Management Report (REV 7) prepared by BRS dated July 2024(2).PDF (1.11 MB) (PDF)
  • document icon Exhibit MPM 3 - 06. Stormwater Management Plan (Rev I) prepared by AWC dated 26.7.24(2).PDF (18.3 MB) (PDF)
  • document icon Exhibit MPM 3 - 07. Detailed Site Investigation prepared by ENV dated June 2024(2).PDF (52.2 MB) (PDF)
  • document icon Exhibit MPM 3 - 08. Statement of Environmental Effects (REV A) preapred by BRS dated 14 June 2024(2).PDF (3.88 MB) (PDF)
  • document icon Exhibit MPM 3 - 09. BDAR (REV 11) prepared by Greenloading Biostudies dated July 2024(2).PDF (53.2 MB) (PDF)
  • document icon Exhibit MPM 3 - 10. Engineering Plans (REV G) prepared by BRS(2).PDF (123 MB) (PDF)
  • document icon Exhibit MPM 3 - 11. Suplementary Traffic Impact Assessment 11.7.24(2).PDF (2.78 MB) (PDF)
  • document icon EXHIBIT MPM5 -1. Proposed Development Site Plan (Issue G.3) prepared by BRS dated 24 Janaury 2025.PDF (7.86 MB) (PDF)
  • document icon EXHIBIT MPM5 - 2. Revised Engineering Plans (REV J) prepared by BRS dated 24 January 2025.PDF (50.3 MB) (PDF)
  • document icon EXHIBIT MPM5 - 3. Design Report for the Dunoon Road Intersections (Rev 2) prepared by BRS dated 17 October 2024.PDF (8.2 MB) (PDF)
  • document icon EXHIBIT MPM5 - 4. Stormwater Management Plan (Rev J) prepared by AWC dated 20 February 2025.PDF (9.26 MB) (PDF)
  • document icon EXHIBIT MPM5 - 5. Vegetation Manahement Plan prepared by Australian Wetlands Consulting Pty Ltd dated March 2025.PDF (24.9 MB) (PDF)
  • document icon EXHIBIT MPM5 - 6. Environmental Management Plan (Rev D) prepared by Australian Wetland Consulting Pty Ltd dated 21 February 2025.PDF (13.5 MB) (PDF)
  • document icon EXHIBIT MPM5 - 7. Anthropology Expert Report FILED 11_12_24 - V2_paginated.PDF (7.58 MB) (PDF)
  • document icon Exhibit MPM6 - 1. Revised Engineering Plans (REV J) prepared by BRS dated 24 January 2025 - Full Set.PDF (121 MB) (PDF)
  • document icon Exhibit MPM6 - 2. Detailed Site Investigation (Rev V1.0) prepared by ENV Solutions dated 17 July 2024.PDF (52.3 MB) (PDF)
  • document icon Exhibit MPM6 - 8. 220746 NLP_MUSIC_CATCHMENT CALCS.PDF (45.1 KB) (PDF)
  • document icon Exhibit MPM6 - 9. 220746_BRS_MUSIC_RESULTS.XLSX (38.8 KB) (XLSX)
  • document icon EXHIBIT MPM4 Tab2 - TUFLOW Files - Results DE01 (20.5 MB) (zip)
  • document icon EXHIBIT MPM4 Tab1 TAB2 (7.5 MB) (zip)
  • document icon EXHIBIT MPM4 - Tab2 - TUFLOW Files - Model (7.64 MB) (zip)
  • document icon EXHIBIT MPM4 Tab2 - TUFLOW Files - Results-EX01-2d -MB01_EX01 (18.6 MB) (zip)
  • document icon EXHIBIT MPM4 Tab2 - TUFLOW Files - Results-EX01-2d -plot and grids (18.7 MB) (zip)